Owners and managers of reinforced concrete buildings are being asked to look again at transfer slabs. Over the past two years the Building Safety Regulator, RICS and the Institution of Structural Engineers (IStructE) have all issued guidance on the subject. They agree on the main point. A transfer slab does not, on its own, mean a building is unsafe or needs to be vacated. But owners are expected to know where their transfer slabs are and to manage them proportionately.
A transfer slab carries a column from the floor above where there is no column directly below. The slab spreads the load sideways to the columns on either side. You often find them where the column grid changes between floors. Typical examples are flats over car parks, residential floors above retail or podium space, and large halls beneath floors divided into smaller rooms. They have been in common use in UK reinforced concrete buildings for more than 25 years.
In November 2024 IStructE published new guidance on designing transfer slabs. It was written for new buildings. However, it raised questions about whether older design methods gave existing slabs enough strength, particularly against punching shear, where the load from a column punches a cone of concrete through the slab. In the worst case, a failure could cause partial collapse.
The Building Safety Regulator alerted building owners to the potential risk in December 2025. RICS issued a Practice Alert in January 2026. The regulator and IStructE published further guidance in July 2026, and the regulator updated its transfer slabs toolkit in October 2026. IStructE expects to publish dedicated assessment guidance in 2027.
It helps to keep this in perspective. There are no recorded UK collapses from this cause, and the regulator says most transfer slabs are likely to be adequate.
The risk goes up in three situations. The first is where water reaches the slab, as in car parks, podiums and external decks. The second is where loads change because of a new use, plant, storage or roof equipment. The third is where the slab is cut or drilled for coring, new openings or intrusive surveys.
Watch for cracks in the slab or in tiling fixed to it, cracks in columns or walls just above or below, and doors that start sticking on the floor just above. If you see new or growing cracks, get urgent specialist advice.
1. Identify - Check drawings and records to find out which of your buildings have transfer slabs. If you don't know, ask a structural engineer or surveyor.
2. Control works - Don't allow coring, new openings or load changes until a competent structural engineer has checked them.
3. Watch - Brief facilities and building teams on the warning signs, and act on concerns raised by occupants.
4. Keep it dry - Prioritise waterproofing and drainage where slabs are exposed to water.
5. Assess and record - Get an engineer's assessment for priority buildings and record each slab on your risk register. For higher-risk buildings, review your safety case and talk to your insurers.
Monaghans' Health & Safety Consultancy team can help you screen your buildings and put proportionate controls in place. Call 0114 249 2000 or email steve.hanson@monaghans.co.uk.